ecomg@ecomg.ru
пн - пт: 09:00-18:00
Personal Profile
Menu
Menu

About us

«ЭКОМАШГРУПП» — разработчик и производитель современного оборудования на основе запатентованных технологий для экологически безопасной переработки широкого спектра отходов.
Пресс-центр
С Международным женским днём!
Посмотреть новость
13 500 000
tonn per year the total productivity of our MRF

Based on our hands-on experience, we develop projects that enable us to avoid unexpected expenses, using optimal and sufficient equipment, buildings, and structures tailored to the customer needs.

10
years of experience

Since 2009, ECOMASHGROUP has completed more than 140 projects in 25 regions in Russia and abroad.

140
facilities sold

ECOMASHGROUP performs the whole range of works related to design, manufacture and turnkey installation of equipment of any capacity for MSW processing.

The group of companies includes

01
ECOMASHGROUP LLC

Designing and manufacturing the equipment

02
ECOMASHGROUP-MO LLC

Producing import-substituting equipment

03
MONTAZHTEKHSTROY LLC

Constructing, manufacturing metal structures

04
ECOMASHGROUP LLC RESEARCH AND PRODUCTION ASSOCIATION

Designing

Why ECOMASHGROUP?

State-of-the-art production

The production base of Ecomashgroup complies with European standards in terms of ergonomics and quality control and is equipped with cutting-edge industrial equipment.

01
High precision metal machining services
02
Computer-aided manufacturing
03
Equipment from leading world manufacturers
04
State-of-the-art hardware components
In-house design bureau
Management certification ISO 9001:2008 GOST 9001:2011

Awards and achievements

Our mission

Business nowadays involves high-performance, high-tech, profitable industries that can solve the waste problem.

ECOMASHGROUP — the most advanced equipment, top notch service and the professional team. Many years of experience in developing the best waste management facilities enable us to create viable and profitable business for our Partners.

To achieve this objective, we
01
Combined the best Russian and foreign experience
02
Explore and develop high-margin waste sorting technologies
03
In pursuing our mission, we strive to enhance commercial performance while reducing our environmental footprint

History

2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2019
16 facilities with a total capacity of 2,200,000 tons per year
  • The most technology-savvy automated complex has been launched in Gubkin, the Belgorod Region;
  • The new type of equipment has been developed — an accelerating conveyor;
  • 10 years in business;
  • The equipment at 3 automated complexes in the Moscow Region has been assembled;
  • The equipment has been manufactured for 16 facilities in the following cities: Irkutsk, Gubkin, Kamchatka, Sakhalin, Omsk, Karaganda (Kazakhstan), Kashira, Kolomna, Saransk, Yegoryevsk, Ishimbay;
  • 4 waste management facilities have been fully designed.
2018
17 facilities with a total capacity of 1,500,000 tons per year
  • ECOMASHGROUP — a group of companies;
  • The new type of equipment has been developed — a plastic bag shredder;
  • The largest and most efficient automated complexes in Russia have been designed and sold: Zaraysk, Roshal;
  • The equipment has been manufactured for 17 facilities in the following cities: Tver, Tikhvin, Okulovka, Republic of Udmurtia, Oktyabrsky, Budenovsk, Stavropol, St. Petersburg, Gubkin, Nadym, Sukhinichi.
2017
7 facilities with a total capacity of 650,000 tons per year
  • The equipment has been manufactured for 10 facilities in the following cities: Murmansk, Tiraspol, Dolgoprudny, Troitsk, Sharya, Orenburg, Moscow, Astana;
  • The first sorting line in the Arctic Circle, in Murmansk, has been launched.
2016
23 facilities with a total capacity of 1,200,000 tons per year
  • The new type of equipment has been developed — a roll-type separator;
  • The equipment has been manufactured for 23 facilities in the following cities: Sterlitamak, Vyborg, Luga, St. Petersburg, Blagoveshchensk, Balakovo, the Tambov Region, Ufa, Naberezhnye Chelny, Tver, Moscow, Podolsk, Tambov;
  • Layer leveler.
2015
7 facilities with a total capacity of 500,000 tons per year
  • MRF for 200,000 tons has been launched in Moscow (Dolgoprudny);
  • The equipment has been delivered to the following cities: Moscow, Novy Urengoy, Primorskiy Kray, Beloretsk, Kyshtym, Cheboksary, the Krasnoyarsk Territory — a total of 10 facilities.
2014
10 facilities with a total capacity of 1,000,000 tons per year
  • The thermal recycling unit has been installed and commissioned in Bulgaria;
  • MRF lines have been launched in the following cities: Khabarovsk, Sukhinichi, Minsk, Kortkeros, Ishimbay, Neftekamsk, Podolsk, Gus-Khrustalny;
  • Some equipment for the first automated sorting complex in Russia, Kostroma, has been delivered, a total of 11 MRFs;
  • The new type of equipment has been developed — a drum screen.
2013
13 facilities with a total capacity of 1,150,000 tons per year
  • The thermal recycling unit has been installed and commissioned in Orenburg;
  • The first major MSW sorting line for 200,000 tons has been installed in Orenburg;
  • We supply equipment for the Olympics as requested by the International Olympic Committee. The agreement has been concluded for 5 waste recovery facilities in Sochi for the Olympics, including the ones for 200,000, 100,000 and 80,000 tons. In December, January, and February until the beginning of the Olympics, the equipment was installed round-the-clock;
  • The sorting lines in Voronezh, Angarsk, Kazakhstan (Karaganda), Domodedovo, Nadym have been launched — a total of 12 MRFs;
  • The first sorting line abroad, in Kazakhstan, has marked our entering the international market.
2012
4 facilities with a total capacity of 500,000 tons per year
  • The facilities in Perm and Stavropol have been installed and commissioned;
  • We have expanded our activities, adding sorting to waste recycling, and started developing material recovery facilities;
  • The agreement was concluded for supply of the first sorting line to Sterlitamak (Bashkiria) and the line was launched before the New Year!
  • We became a Skolkovo resident — we joined Ecoenergy Laboratory Research and Production Association.
2011
2 facilities
  • The first contracts for supply of plants to Perm and Staropol has been concluded;
  • We took part in the international exhibition "CISMEF-2011" (Guangzhou, China);
  • Business trip to Austria to study waste recycling technologies became reality;
  • The first prototype models of equipment for MSW thermal recycling have been developed and manufactured.
2010
  • The first patent for MSW thermal recycling unit has been received;
  • The pilot plant in Tver has been launched;
  • We took part in WASMA exhibition for the first time;
  • The MSW recycling project has been presented at the International Investment Forum in Sochi.
2009
  • The first prototype models of equipment for MSW thermal recycling have been developed and manufactured.

Our business team

The company philosophy, according to which technical progress should never be detrimental for the environment, was carved out by the team of like-minded people.

Alexander Pugin

General Director of ECOMASHGROUP

Alexander Petrov

Technical Director of ECOMASHGROUP

Yuri Khomik

Сhief Designer

Vladislav Zykov

Director of Operations

Kirill Lukin

Head of the Procurement and Logistics Department

Konstantin Egurnov

Sales Director

Anna Badeeva

Account Manager

Inal Mamitov

Account Manager

Arseny Mamitov

Leading specialist for interaction with foreign partners


Заявка на проект комплекса! ПОЛУЧИТЕ БЕСПЛАТНО Вам доступен бонус